Dredging of Sheraton Hotel Seawater Intake Pipes , Seawater Channels and A/C Lagoon
Client : Qatar National Hotels Co.
UITC role : Main Contractor
Duration of project : 6 months
Location : Marriott Hotel Marina
Brief Description of Work
• Complete dismantling of existing old marina (Marina 1) using suitable manpower and marine equipment.
• Fabrication, supply and installation of new marina (Marina 1) using suitable manpower and marine equipment.
• Civil repair works
• Major cleaning, renovation and maintenance of marina 2 & 3.
• Underwater installation works.
Design, Supply and Installation Of Pilot and Mooring Boats Pontoons (Marina) For Doha Port
Client :Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 6 months
Location : Offshore fields-Qatar
Brief Description of Work
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar.
Design, Supply and Installation Of Marina for Emiri Yatchs
Client : Emiri Yachts
UITC role : Main Contractor
Duration of project : 3 months
Location : Doha, Qatar
Brief Description of Work
• Design, Supply and Installation of Marina
• MEP Service Installation
• Underwater mooring installation

Legtaifiya Lagoon Barrier System & Dock System
Client : Qatari Diar Real Estate & Investment Co.
UITC role : Main Contractor
Duration of project : 30 months
Location : Doha, Qatar
Brief Description of Work
• Design, Build and Installation of Floating Pontoons at Legtaifiya Lagoon
• Installation of Traffic Barrier Gate System
• Installation of MEP Services
• Installation of Guard House
• Underwater Mooring Installation
• Maintenance for the guarantee period.
Design, Supply & Installation of Marina Walkway
Client : Private Engineering Office
UITC role : Main Contractor
Duration of project : 3 months
Location : Doha, Qatar
Brief Description of Work
• Design, Supply & Installation of VIP Marina Walkway with Pergola. • Underwater installation of mooring equipment.
• MEP Services
• Maintenance Period

Marine Engineering & Contracting

NAVIGATION AIDS & BUOYS PROJECTS

Epic For Navigation Aids To Ras Laffan Port
Client : Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 12 months
Location : Ras Laffan - Qatar
Brief Description of Work
Engineering, procurement, Installation and Commissioning of Navigation aids, mooring buoys Radar beacons equipment for LNG carrier and associated SCADA. Complete pollution response system for Ras Laffan Area.
Navigation Aids Upgrading Project For Doha Port
Client : Building Engineering Department / Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : 9 months
Location : Doha Channel
Brief Description of Work
Engineering, procurement, fabrication, installation and commissioning of 16 Nos. Articulated Beacon. The project also includes removal of 12Nos. existing buoys and 3 redundant beacons and in the channel.
Vessel Management Tracking System
Client : Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : 6 months
Location : Doha, Qatar
Brief Description of Work
Includes design, supply, installation and commissioning of VTMS and the Metocean Data Collection Sensors.
Supply & Installation And Commissioning Of Navigation Channel Buoys For Doha Port
Client : Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : 12 months
Location : Doha, Qatar
Brief Description of Work
• Supply, Fabrication and Erecting of of 43 nos. Tail Tube Buoys, 46 nos. concrete sinkers (w/ spares)
• Supply & Installation of 72 new marine lanterns (including spares)
• Supply & Installation of complete set of mooring system.
• Site Installation using suitable vessels.
Maintenance Of Navigation Lights At QFM Channel (2008-2009)
Client : Qatar Flour Mills
UITC role : Main Contractor
Duration of project : 24 months
Location : Doha, Qatar
Brief Description of Work
Cleaning and replacement of defective parts (lights, battery, solar panels, electrical wirings and modules) by trained technicians and suitable vessels. • Maintenance and check up for a period of 12 months.
Supply & Installation of Navigation Aids For Amiri Diwan
Client : Amiri Diwan Office
UITC role : Main Contractor
Duration of project : 8 weeks
Location : Doha, Qatar
Brief Description of Work
Supply & Installation of Navigation Aids Plotting of location using GPS Underwater installation.
Modification Of Channel Buoys At Mesaieed Channel
Client : Hyundai Engineering
UITC role : Main Contractor
Duration of project : 6 months
Location : Mesaieed Channel (offshore)
Brief Description of Work
Lifting of Buoys from the water & removal of marine growth Adjustment of ballast weights & replacement of mooring chains & assembly Adjustment of radar reflectors & cleaning of lights Repositioning & verifying of coordinates using DGPS Diving Services .
Maintenance Works For 13 QFM Lights
Client : Qatar Flour Mills
UITC role : Main Contractor
Duration of project : 12 months each year
Location : QFM Channel
Brief Description of Work
Cleaning & replacement of defective parts (i.e. lights, battery, solar panels, electrical wirings & modules) using suitable manpower & vessel Maintenance & check up for a period of 2 years.
Maintenance Of Navigation lights - QFM Channel
Client : Qatar Flour Mills
UITC role : Main Contractor
Duration of project : 24 months
Location : Doha. Qatar
Brief Description of Work
Cleaning and replacement of defective parts (i.e. lights, battery, solar panels, electrical wirings and modules) by trained technicians and suitable vessels. Maintenance and check up for a period of 12 months.
MetOcean System at Doha Port
Client : Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : 6 months
Location : Doha Port
Brief Description of Work
• Includes design, supply, installation and commissioning of VTMS and the Metocean Data Collection Sensors.
EPIC For Weather Station Of RasLaffan Port
Client :Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 6 months
Location : Offshore fields-Qatar
Brief Description of Work
Design, Fabrication and supply of Deep water back off mooring system for various offshore locations in Qatar.
Installation Of Automatic Weather Stations
Client : Meteo France International / Civil Aviation Authority Qatar Meteorological Dept. (2006)
UITC role : Sub-Contractor for Meteo France International
Duration of project : 12 months
Location : 6 different locations (Weather stations of Al Khor, Al Ruwais, Dukan, Abu Samra Mesaieed, DohaUniversity)
Brief Description of Work
• Site preparation including leveling and fencing. • Casting and fixing of concrete slabs. • Preparation of mahole with shrouds to interconnect different sensors.

Installation and Maintainence Of 6 nos. Automatic Weather Stations -2nd Phase (6 Locations -second phase of previous contract -2008-2009-ON PROGRESS)
Client : MeteoFrance International /Qatar Civil Aviation Authority/Qatar Meterological Dept.
UITC role : Sub Contractor
Duration of project : 12 months
Location : Qatar ( 6 new different locations outside Doha)
Brief Description of Work
• Site preparation including leveling and fencing • Casting and fixing of concrete slabs • Preparation of manholes with shrouds to interconnect different sensors. • Installation of weather monitoring equipment • Periodic maintenance of weather equipment.
LC10102400 EPIC Of Weather Stations at Different Productions Stations within Dukhan Fields (ON PROGRESS)
Client : MeteoFrance International /Qatar Civil Aviation Authority/Qatar Meterological Dept.
UITC role : Sub Contractor
Duration of project : 12 months
Location : Qatar ( 6 new different locations outside Doha)
Brief Description of Work
• Site preparation including leveling and fencing • Casting and fixing of concrete slabs • Preparation of manholes with shrouds to interconnect different sensors. • Installation of weather monitoring equipment • Periodic maintenance of weather equipment.

METEROLOGY PROJECTS

OFFSHORE PROJECTS

Upgrade works of the living Quarter
Client : Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 12 months
Location : PS4 - North field Qatar
Brief Description of Work
Engineering, procurement, Installation and Commissioning, Upgrade works of the living Quarter including demolition, removal, reconstruction, Mechanical, Electrical, HVAC, Fire and safety. All works successfully completed on time. A jack-up barge was used as temporary accommodation to avoid shut down.
Deep water back off mooring System
Client :Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 6 months
Location : Offshore fields-Qatar
Brief Description of Work
Engineering, procurement, Installation and Commissioning, Upgrade works of the living Quarter including demolition, removal, reconstruction, Mechanical, Electrical, HVAC, Fire and safety. All works successfully completed on time. A jack-up barge was used as temporary accommodation to avoid shut down.
STCC190A/99 (Permanent power supply for RLC front and rear leading lights)
Client : Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 6 months
Location : RasLaffan - Qatar
Brief Description of Work
Engineering, procurement, Installation and Commissioning of 240 V power and transformers lines to various locations including a sub-sea power cables and buried land cables.
Sub-sea Cabling: The 4 core LV cable is approximately 300Mtrs length in the seabed, which was installed with protection of specially designed concrete blocks. The complete works were inspected by client inspectors/divers after the completion of cable laying works.
Ltc-14/176- Upgrade Of Laundry Facilities At Nfa -Ps4
Client : Qatar General Petroleum Corporation
UITC role : Main Contractor
Duration of project : 7 months
Location : Offshore - New Found Alpha (NFA-PS-4)
Brief Description of Work
• Supply of Industrial Washing Machines & Dryers including spare parts.
• Demolition of existing laundry facilities & Installation of new ones
• Upgrade of Electrical Circuits
• Final Commissioning
The Scope of Work includes
The Scope of Work includes:
• Dredging of A/C Lagoon • Removal of accumulated silt and sand • Cleaning of seawater intake pipe and channel • Pre and Post Survey
United Construction Est./Cybarco Co. Ltd.
Client :United Construction Est./Cybarco Co. Ltd.
UITC role : Main Contractor
Duration of project : 4 weeks
Location : Al Sharq Low Rise Hotel and Leisure Resort
Brief Description of Work
• Dredging of Beach area • Removal of accumulated silt and sand using suitable dredger • Disposal of dredged materials in a silt bund provided by the client • Pre and Post Survey Works
Joannou&Paraskevaides (Overseas) Limited (J& P)
Client : Joannou&Paraskevaides (Overseas) Limited (J& P)
UITC role : Subcontractor
Duration of project : 3 months
Location : The Pearl Qatar
Brief Description of Work
• Dredging Works at the Qanat Quartier, Pearl Qatar • Diving & Underwater Survey Works. • Manual Underwater removal of debris . different sensors.

Doha Marine Co. (DMC) UITC role
Client : Doha Marine Co. (DMC)
UITC role : Sub Contractor
Duration of project : 6 months
Location : Doha Corniche
Brief Description of Work
• Dredging Works – Removal of Silth & soft sediments • Disposal of Silt & Soft sediments • Diving surveys • Pre & Post Dredging Survey
Qatari Diar Real Estate & Investment Co. ( CONTRACT EXTENSION) UITC role
Client : Qatari Diar Real Estate & Investment Co. ( CONTRACT EXTENSION)
UITC role : Main Contractor
Duration of project : 12 months
Location : Doha, Qatar
Brief Description of Work
• Beach Cleaning & Maintenance for 2 rounds • Underwater Silt removal using suitable dredger.

DREDGING WATER PROJECTS

WORK BOAT SUPPLY PROJECTS

Build & Supply Of Twin Screw Pilot Launch
Client : Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : -
Location : Fabrication Phase and Initial Test: GujanMetras, France Final Acceptance Test: DohaPort
Brief Description of Work
Build & Supply 1 no. 16 m Pilot Boat
Charter Of Vessel and Barge For The State Of Qatar National Day Celebrations Firework Display
Client :State National Day Organizing Committee
UITC role : Sub-Contractor for Meteo France International
Duration of project : 2 weeks
Location : Doha. Qatar
Brief Description of Work
• Provision of Barges for the installation of Pyrotechnics for the State National Day Celebrations • Provision of support vessels, staff and consumables.
Build and Supply of 2 units Mooring Boats For Doha Port (ON PROGRESS)
Client : Qatar Ports Management Co. ( formerly Customs and Ports General Authority)
UITC role : Main Contractor
Duration of project : 12 months
Location : United Kingdom
Brief Description of Work
• Build and Supply of 2 units Mooring Boats • Maintenance for the guarantee period.
Sub-sea Cabling: The 4 core LV cable is approximately 300Mtrs length in the seabed, which was installed with protection of specially designed concrete blocks. The complete works were inspected by client inspectors/divers after the completion of cable laying works.
Build and Supply Of Twin Screw Pilot Launch (2 Units )
Client : Customs & Ports General Authority
UITC role : Main Contractor
Duration of project : 12 months
Location : France
Brief Description of Work
" Build and Supply of 2 additional units 16 m Pilot Boat for DohaPort in addition to the 1 unit previously supplied " Maintenance for the guarantee period.
Build and Supply of 2 units 65 Tons Bollard Pull and Tug For Doha Port (ON PROGRESS)
Client : Qatar Ports Management Co. ( formerly Customs and Ports General Authority)
UITC role : Main Contractor
Duration of project : 36 months
Location : Vietnam
Brief Description of Work
• Build and Supply of 2 units 65 Tons Bollard Pull and Tug • Commissioning, Training & Maintenance.
Sub-sea Cabling: The 4 core LV cable is approximately 300Mtrs length in the seabed, which was installed with protection of specially designed concrete blocks. The complete works were inspected by client inspectors/divers after the completion of cable laying works.
Charter of Tug & Barge (ON PROGRESS) -Transportation Of Materials To Halul
Client : Orientals Enterprises
UITC role : Subcontractor
Duration of project : 2 months
Location : Doha Port – Halul Island
Brief Description of Work
• Charter of Tug Boat • Charter of 85.3 m Barge • Transport of construction Materials from Doha to Halul Island • Transportation of Aggregates from RAK ( UAE ) to Halul • Provision of Capt. & Crew